Construction Period of an Air Dome Sports Facility
2024-06-14 10:16:11

An Air Dome sports facility is a modern architectural form that has garnered widespread attention due to its rapid construction characteristics. Compared to traditional buildings, the construction period of an Air Dome Sports facility is significantly shorter, making it an ideal choice for many temporary or urgent projects. Below is a detailed description of the construction period for an air dome sports facility.

 

 1. Construction Preparation Phase

 

 Site Survey and Design Planning

The construction preparation phase includes a detailed site survey and design planning. This step involves site selection, finalizing the design plan, preparing construction materials, and equipment testing. Typically, this phase takes a few weeks to a month.

 

 2. Foundation Treatment and Base Construction

 

 Site Leveling and Base Laying

Although Air Dome Sports Facilities have relatively low requirements for foundations, foundation treatment and base construction are necessary to ensure stability and safety. This includes site leveling and base laying, which generally takes one to two weeks.

 

 3. Membrane and Equipment Installation

 

 Membrane Deployment and Inflation

The core construction phase of an air dome sports facility involves the installation of the membrane and equipment. First, the membrane is spread out at the predetermined location, and inflation begins using blower equipment to gradually form the intended structure.

 

 Fixation System and Control Equipment Installation

Next, the fixation system and control equipment are installed to ensure the stability and safety of the air dome structure. This phase typically takes one to two weeks to complete, depending on the project's scale and complexity.

 

 4. Interior Facilities Installation

 

 Installation of Internal Systems and Equipment

After the air dome structure is completed, the next step is the installation and testing of internal facilities. This includes lighting systems, ventilation and air conditioning systems, flooring, and sports equipment. Since the interior of the air dome sports facility does not require load-bearing columns, the installation work is relatively simple and quick, usually taking one to two weeks.

 

 5. Commissioning and Acceptance

 

 Comprehensive Testing and Safety Acceptance

Finally, a comprehensive commissioning and acceptance of the entire air dome sports facility are required to ensure all systems are functioning correctly and that safety and operational functionalities meet the expected standards. This phase generally takes a few days to a week.

 

 Summary

 

In total, the construction period for an air dome sports facility, from start to finish, typically takes 6 to 8 weeks. Specific timelines include:

 

1. Construction Preparation Phase: A few weeks to a month.

2. Foundation Treatment and Base Construction: One to two weeks.

3. Membrane and Equipment Installation: One to two weeks.

4. Interior Facilities Installation: One to two weeks.

5. Commissioning and Acceptance: A few days to a week.

 1.jpg

Compared to the several months or even years required for traditional building construction, the rapid construction of an air dome sports facility offers significant time benefits in many application scenarios.


Comment

(0)
*Captcha:

About

A technical enterprise specializing in the research and development, design, processing and manufacturing, construction and installation, system maintenance, and sales services of air domes.

Discover More

Contact

  • Building 13, Xinlong Plaza, Yannan High tech Zone, Yancheng City, Jiangsu Province

  • 400-6060-810

  • zql@qspaceairdome.com

  • 156.png

    Contact

    Copyright © Qspace (Jiangsu) Air Domes Technology Co., Ltd

    Term & condition Privacy Policy Contact Us